Alveolar airlock replacement

  • Customer : BENEO ORAFTI

Completion date :

June 2022

BENEO ORAFTI called on our services to replace its existing airlocks and switches with new FOOD-certified equipment with CIP cleaning.

The new equipment installed is perfectly compatible with the customer’s operating conditions, such as the easily removable CIP cleaning phases, in correlation with ATEX safety devices.

To guarantee compliance with food hygiene regulations, we have designed DN350 aseptic flanges based on DIN11864-2.

The overall design was reworked to improve product flow conditions, ensuring that the two existing airlocks were properly supplied. The new installation also includes a special switch on the pneumatic transfer line, allowing the flows to cross. In addition, to ensure ease of maintenance, airlock isolation devices were integrated.

Our team worked on the same project in 2023, this time on the second line of this installation.

Share this project !

View project gallery :

Most recent projects

Addition of a sand filter

Addition of a sand filter

Addition of a sand filter Customer: BIOWANZE Date of completion : July 2020Known for its exploitation of new energy sources from renewable energies, the company BIOWANZE called on our expertise for the extension of its water treatment unit in the wastewater treatment...

Construction of a storage tank

Construction of a storage tank

Construction of a storage tank Customer: BIOWANZE Date of completion: April 2023Our company was selected by BIOWANZE for the engineering of a 3,000 m³ tank for the storage of Protiwanze, a protein-rich animal feed. The foundations of the new reservoir were carefully...

Replacement of sulfuric acid pipes

Replacement of sulfuric acid pipes

Remplacement de tuyauteries d’acide sulfurique Client : BENEO ORAFTI Date de réalisation : 2022 et 2023La société BENEO ORAFTI a fait appel à nos services pour un projet de remplacement de tuyauteries d'acide sulfurique. Les travaux consistent à remplacer environ 575...