Pump replacement
- Customer: BENEO ORAFTI
Date of completion:
July 2022
This oligofructose transfer line connects several storage silos to the processing unit. Given the food-grade nature of the treated product, the entire installation has been studied in compliance with safety standards and the CE 1935/2004 standard. Indeed, all the components used and the installation work comply with the requirements relating to the quality of the materials, as well as the quality of the welds and their processing.
Throughout the project, our team carries out regular monitoring of the work on site, thus making it possible to verify the compliance of the work with the plans and technical standards in force.
Share this project!
The most recent projects
Addition of a sand filter
Addition of a sand filter Customer: BIOWANZE Date of completion : July 2020Known for its exploitation of new energy sources from renewable energies, the company BIOWANZE called on our expertise for the extension of its water treatment unit in the wastewater treatment...
Construction of a storage tank
Construction of a storage tank Customer: BIOWANZE Date of completion: April 2023Our company was selected by BIOWANZE for the engineering of a 3,000 m³ tank for the storage of Protiwanze, a protein-rich animal feed. The foundations of the new reservoir were carefully...
Replacement of sulfuric acid pipes
Remplacement de tuyauteries d’acide sulfurique Client : BENEO ORAFTI Date de réalisation : 2022 et 2023La société BENEO ORAFTI a fait appel à nos services pour un projet de remplacement de tuyauteries d'acide sulfurique. Les travaux consistent à remplacer environ 575...
ENGINEER CONCEPT srl
Head office
Chaussée de Frasnes 8
7911 Hacquegnies, Belgium
Operational headquarters
Rue Jean Jaurès, 10 b
Bureau 13
7350 Thulin, Belgique
© Copyright – ENGINEER CONCEPT srl | Legal notice | [rcb-consent type=”change” tag=”a” text=”Changing consent”] | Powered by Tragg